This is pretty much how I left it last year bar cleaning up again ready for this welding.

That was an awkward shape to get in, so I cut a bit more off to get more room the other side.

Made a patch that fitted. Easier when you have access the other side as I could roughly get to shape and put the otherside and mark off a more exact measurement.

A lot of fiddling to get into place and held.

The light area made a handy earthing point.

Then a couple of tacks to hold in place as it was getting late and I wouldn't finish it that day. Leaving a few days would likely leave it ending up on the floor.

Fast forward to yesterday evening when I had some more time to get on with this. Hellish first week back affected my mojo for getting on with welding in the evenings and I suspect it's not going to get any better, so progress from now is likely to be slow again.
Anyhow finished welding it up and took off the top of the welds. I'm not going to grind all the way back as it's an awkward place to work and its not really visible normally either.

Then painted. Which has just reminded me, I need to put paint on the inside...!

Not sure if I want to tackle the front of the car just yet. I might put some paint over to protect it and then come back later for it. Feel that it's probably one of those faffy jobs that will take forever to get right. Also need to get some thinner steel and try out seeing if that's easier to shape than the stuff I have at the moment. I can shape the 0.9mm/20 gauge stuff I have, but it's not the most pliable. For the front end wing, it's not structural but it is quite shaped. So thinner stuff should be ok here.
Also need to either repair or replace the light holders. I really don't want to cut the wing or front valance off as I think it's a bit unnecessary for the work that needs doing there. Cutting them off will be a right faff in getting them back on and they risk never be right. Not that they probably were out of the factory anyway!